|
11 |
Matter of permission for Short-term Open Access(ST
Matter of permission for Short-term Open Access(STOA)
|
1214/2012 |
Shah Alloys Limited
Shah Alloys Limited
|
SLDC & UGVCL
SLDC & UGVCL
|
10-07-2012 11:30
|
|
12 |
In the matter of compliance of the GERC ( Procurem
In the matter of compliance of the GERC ( Procurement of energy from Renewable Sources) Regulations, 2010 notified by the Commission
|
Suo –Motu Pet. 1219/2012 |
|
GEDA, GUVNL, MGVCL, DGVCL, UGVCL, PGVCL, TPL,SURAT
GEDA, GUVNL, MGVCL, DGVCL, UGVCL, PGVCL, TPL,SURAT, TPL,AHMEDABD, KANDLA TRUST PORT, MPSEZ, JUBLICANT INFRASTURE LTD. & SYNEFRA CO.LTD.
|
10-07-2012 11:30
|
|
13 |
Fixation of Tariff for two small hydro power proje
Fixation of Tariff for two small hydro power projects
|
1024/2010 |
Tarini Infra. Ltd
Tarini Infra. Ltd
|
GUVNL, GETCO & Govt. of Gujarat, Irrigation De
GUVNL, GETCO & Govt. of Gujarat, Irrigation Department
|
10-07-2012 11:30
|
|
14 |
Implementation of Intra-State Open Access in the D
Implementation of Intra-State Open Access in the Distribution Licensees
|
Suo-Motu Petition No. 1226/2012 |
|
GUVNL, MGVCL, DGVCL, UGVCL, PGVCL, SLDC, TPL &
GUVNL, MGVCL, DGVCL, UGVCL, PGVCL, SLDC, TPL & TEL
|
10-07-2012 11:30
|
|
15 |
Interpretation/clarification and/or review of GERC
Interpretation/clarification and/or review of GERC (Electricity Supply Code and related matters) Regulations, 2005 read with Distribution Code and various provisions of the Electricity Act, 2003 for getting permission for utilisation of power supply from the existing connection (having the consumer number 26413) at the premises owned by the petitioner to its other adjoining lands;
|
1192/2012 |
Rolex Rings Pvt. Ltd.
Rolex Rings Pvt. Ltd.
|
PGVCL
PGVCL
|
21-07-2012 03:30
|
|
16 |
Petition under section 86(1)(f) of the Electricity
Petition under section 86(1)(f) of the Electricity Act, 2003 for adjudication of disputes between a generating company and a distribution licensee
|
1200/2012 |
Kindle Engg. & Construction Pvt. Ltd.
Kindle Engg. & Construction Pvt. Ltd.
|
Torrent Power Ltd.
Torrent Power Ltd.
|
21-07-2012 03:30
|
|
17 |
Petition under section 86(1)(f) of the Electricity
Petition under section 86(1)(f) of the Electricity Act, 2003 for adjudication of the disputes
|
1202/2012 |
GUVNL
GUVNL
|
Nitash Co-generation Pvt. Ltd.
Nitash Co-generation Pvt. Ltd.
|
21-07-2012 03:30
|
|
18 |
In the matter under regulation 80 of the GERC reg.
In the matter under regulation 80 of the GERC reg. 2004 readwith section 86(1)(b) of E.A., 2003, for approval of PPA
|
1205/2012 |
Kindle Engineering & Construction Pvt. Ltd.
Kindle Engineering & Construction Pvt. Ltd.
|
Torrent Power Ltd.
Torrent Power Ltd.
|
21-07-2012 03:30
|
|
19 |
Application under article 13 of the PPA dated 2.02
Application under article 13 of the PPA dated 2.02.2007 entered between GUVNL, and Adani Power Ltd. for the adjustment of tariff.
|
1210/2012 |
Adani Power Ltd. .
Adani Power Ltd. .
|
GUVNL
GUVNL
|
21-07-2012 03:30
|
|
20 |
Adjudicate of disputes between the PPA dated 30.04
Adjudicate of disputes between the PPA dated 30.04.2010
|
1212/2012 |
Azure Power (Gujarat) Pvt. Ltd.
Azure Power (Gujarat) Pvt. Ltd.
|
GUVNL
GUVNL
|
21-07-2012 03:30
|
|
|